Power Quality Audit

Measurement-led diagnosis of harmonics, voltage events, flicker and power factor — for supply systems from 415 V upward. Every offer here starts with recorded data, not assumption.

7Individual offers
415 VMinimum system voltage
IEC 61000-4-30Class A measurement
Vendor-neutralSolution design

Think of a power quality audit as a diagnostic. We measure harmonics, voltage events, flicker and power factor at your site, then trace whatever's causing trouble back to its source before it causes equipment failure, stoppages, or utility penalties. Every finding is checked against applicable IEEE and IEC guidelines, for facilities from 415 V upward with no fixed ceiling.

What's included

Seven offers, one measurement discipline

Each offer below can be commissioned standalone or combined into a full facility PQ audit. All are built on Class A instrumentation and referenced to the standard that governs the phenomenon being measured.

Harmonic Audit — THDᵥ & THDᵢ

Full-spectrum voltage and current harmonic measurement at PCC and downstream feeders, with root-cause attribution to specific non-linear loads.

IEEE 519-2022 →
IEEE 519 Code Compliance Audit

Formal compliance assessment against IEEE 519 voltage and current distortion limits at the point of common coupling, with a clear compliance position and remediation path.

IEEE 519-2022 →
Voltage Fluctuation Study

Sag and swell event capture and classification, correlated against process trips and equipment nuisance faults.

IEC 61000-4-30 →
Flicker Correction Study

Short-term and long-term flicker severity (Pst/Plt) measurement for facilities running arc furnaces, welders, large VFDs or other fluctuating loads.

IEC 61000-4-15 →
Power Factor Correction Study

Displacement and true power factor assessment with correctly sized correction, accounting for harmonic-rich loads that make naive capacitor sizing dangerous.

IEEE 1459 →
Floating Grid PF Correction Study

Power factor correction for ungrounded / floating neutral systems — marine vessels, offshore platforms, and process plants where standard grounded-grid PF correction assumptions do not apply.

IEC 61642 →
PQ Solution Design & Validation

Vendor-neutral specification of the correction technology — harmonic filters, PF correction, reactors, MV solutions or STATCOM — once the audit has identified the problem.

IEEE 519-2022 →
Get in touch

Talk to our team
about these offers

Tell us which offer fits your facility, or describe the problem you're seeing — we'll recommend the right scope.

Request a consultation
© 2025 Singh Consulting — singhconsulting.in IEEE 519 · IEC 61000 · IEEE 1584 · ISO 50001