PQ Solution Design & Validation

Vendor-neutral specification of the correction technology — harmonic filters, PF correction, reactors, MV solutions or STATCOM — once the audit has identified the problem.

Scope of work

  • Technology selection — passive filter vs. active filter vs. hybrid vs. STATCOM vs. DVR, based on load profile
  • Sizing and rating specification independent of any single manufacturer
  • Comparative options with multiple qualified solution providers for competitive quotes
  • Post-installation validation measurement to confirm the solution met design targets

Deliverables

  • Solution specification document — technology, rating, staging
  • Vendor-neutral RFQ pack for competitive sourcing
  • Post-installation validation report
© 2025 Singh Consulting — singhconsulting.in IEEE 519 · IEC 61000 · IEEE 1584 · ISO 50001